| Release Date | September 15, 2026 |
|---|---|
| Release Owner | Ryan VanderMeulen |
| Corresponding ESR releases | 153.2.0 · 140.15.0 |
| Nightly cycle length | 4 weeks |
| Beta cycle length | 4 weeks |
| Milestones | |
|---|---|
Deadline to request manual QAQA has been informed (via a Jira ticket) about features that require manual testing during the nightly and/or beta cycle. |
July 17 In 30.5 weeks |
Deadline to request accessibility engineering reviewAccessibility engineering review has been requested (using the |
July 17 In 30.5 weeks |
Nightly startsThe first day of the cycle is Merge Day. After merging mozilla-central to mozilla-beta, we bump the nightly version number on mozilla-central and a new development cycle starts for Firefox. A new Firefox Nightly is shipped every 12 hours. |
July 20 In 31 weeks |
Build ready for QAFeatures with a QA request are ready for testing to assess feature quality and provide a formal test report by the end of Week 2 of the nightly cycle. |
July 31 In 32.5 weeks |
QA Test Plan approval dueThe QA team appreciates an earlier sign-off from the project teams. The approval milestone will be the final deadline for any feature Test Plan sign-offs. No feedback/sign-off on QAs Feature Test Plan could result in misalignment on testing scope, incomplete test coverage and invalid bugs. |
July 31 In 32.5 weeks |
Soft Code Freeze starts Draft beta release notesWe are nearing the end of the nightly cycle. Don't land new untested features. Risky changes should be avoided after 8:00 AM UTC until after the nightly version bump on Merge Day. |
August 13 In 34.5 weeks |
String Freeze startsIn order to ensure that our localizers have adequate time to translate strings, please make sure that all string changes have landed by end of day. |
August 14 In 34.5 weeks |
QA pre-merge regression testing doneQA assess build readiness for shipping to Beta by running a set of Regression test cases and shares a test report. |
August 14 In 34.5 weeks |
Merge dayThis is the day in the release cycle when we merge mozilla-central into mozilla-beta. This is the end of the development cycle for Firefox 155 and the beginning of our Beta stabilization cycle. |
August 17 In 35 weeks |
Beta 1 Go to buildBuilt manually just after the merge. It ships on Tuesday. Uplift requests are open. |
August 17 In 35 weeks |
Beta 1Rolled out to 25% of our beta population. Some experimental features are still activated to watch their behavior on a wider population. These experimental features will be deactivated mid-cycle. |
August 18 In 35 weeks |
Beta 2First automated beta of the cycle. It is rolled out to 50% of our beta population. Build starts at 13:00 UTC. |
August 19 In 35.5 weeks |
Beta 3Beta rollout bumped to 100% provided stability is good. Build starts at 13:00 UTC. Stabilization work via uplifts. |
August 21 In 35.5 weeks |
SUMO content creationUser affecting changes were identified and provided to the support.mozilla.org team. The support content for this release can now be created and will be translated before RC week. |
August 21 In 35.5 weeks |
Beta 4Build starts at 13:00 UTC. Stabilization work via uplifts. |
August 24 In 36 weeks |
Beta 5Build starts at 13:00 UTC. Stabilization work via uplifts. |
August 26 In 36.5 weeks |
Beta 6 Last early betaOn a regular 4 weeks beta cycle, Beta 6 is the last beta with experimental features still activated. Build starts at 13:00 UTC. Stabilization work via uplifts. |
August 28?
In 36.5 weeks |
Beta 7Experimental features are no longer activated at compile time. Build starts at 13:00 UTC. Stabilization work via uplifts. |
August 31 In 37 weeks |
SUMO content localizationNew content on support.mozilla.org team is finalized, uploaded to the server and provided to our localization teams internationally. |
August 31 In 37 weeks |
Beta 8Last week of the beta cycle. Build starts at 13:00 UTC. Stabilization work via uplifts. |
September 2 In 37.5 weeks |
Pre-release QA sign-offA week before the final sign-off, QA shares preliminary test reports for each feature riding the train. This pre-release sign-off can be Green, Yellow or Red. |
September 2 In 37.5 weeks |
Beta 9 Last beta uplifts (sec-approval request deadline)On a regular 4 weeks beta cycle, this is the last beta and thus the end of beta uplifts, including security bugs for this release ( |
September 4 In 37.5 weeks |
Release Candidate Go to buildWe merge our mozilla-beta repository to mozilla-release and close mozilla-beta until the next merge day. We then build our Release Candidate from mozilla-release. This is the build we intend to ship a week later unless we need to build another Release Candidate to fix a major quality or business critical issue. |
September 7 In 38 weeks |
Release Candidate Release notes finalizedOur Release Candidate is shipped to all of our beta population. |
September 8 In 38 weeks |
Release day!We ship Firefox 155 at 14:00 UTC (6AM PST) at 25% rollout. |
September 15 In 39 weeks |
Potential Android dot releaseOne week after the release, we evaluate shipping an Android dot release to address identified issues. We can also enable new features on a on a case by case basis if they are suitable for uplift. The decision on shipping or not this dot release for Android is on the release management team. |
September 22 In 40 weeks |
Planned dot releaseTwo weeks after the release, we ship a desktop and/or an Android dot release to address identified quality issues with safe fixes ready. We can also enable new features on a on a case by case basis if they are suitable for uplift. We may have to ship other dot releases before that date. If this is the case and post-release quality issues are already fixed and shipped, the decision on shipping or not the planned dot release is on the release management team. |
September 29 In 41 weeks |
| Milestones | |
|---|---|
155.0 branch is createdThe |
September 4 |
155.0 release candidate is createdThe 155.0 release candidate is created based on the |
September 4 |
Preliminary QA sign off on 155.0QA gives a preliminary sign off on 155.0. If it is green, we push the build to the External Beta Testers group. Otherwise, the dev team fixes the issues reported by QA, uplift them to the release branch and we build another Release Candidate. |
September 7 |
Final QA sign off on 155.0 Release notes readyQA gives its final sign off on 155.0. If the sign off is red, the dev team fixes the issues reported by QA, uplift them to the release branch and we build another Release Candidate. |
September 8 |
155.0 sent to Apple StoreWe submit 155.0 for review to the Apple Store. If we don`t have a working build by the end of the day, we may not ship this week. |
September 8 |
155.1 branch is createdThe |
September 11 |
155.1 release candidate is createdThe 155.1 release candidate is created based on the |
September 11 |
155.0 is shipped155.0 is shipped on the Apple Store at 3:00 AM UTC with a phased 7 days rollout: |
September 14 |
Preliminary QA sign off on 155.1QA gives a preliminary sign off on 155.1. If it is green, we push the build to the External Beta Testers group. Otherwise, the dev team fixes the issues reported by QA, uplift them to the release branch and we build another Release Candidate. |
September 14 |
Final QA sign off on 155.1 Release notes readyQA gives its final sign off on 155.1. If the sign off is red, the dev team fixes the issues reported by QA, uplift them to the release branch and we build another Release Candidate. |
September 15 |
155.1 sent to Apple StoreWe submit 155.1 for review to the Apple Store. If we don`t have a working build by the end of the day, we may not ship this week. |
September 17 |
155.2 branch is createdThe |
September 18 |
155.2 release candidate is createdThe 155.2 release candidate is created based on the |
September 18 |
155.1 is shipped155.1 is shipped on the Apple Store at 3:00 AM UTC with a phased 7 days rollout: |
September 21 |
Preliminary QA sign off on 155.2QA gives a preliminary sign off on 155.2. If it is green, we push the build to the External Beta Testers group. Otherwise, the dev team fixes the issues reported by QA, uplift them to the release branch and we build another Release Candidate. |
September 21 |
Final QA sign off on 155.2 Release notes readyQA gives its final sign off on 155.2. If the sign off is red, the dev team fixes the issues reported by QA, uplift them to the release branch and we build another Release Candidate. |
September 22 |
155.2 sent to Apple StoreWe submit 155.2 for review to the Apple Store. If we don`t have a working build by the end of the day, we may not ship this week. |
September 24 |
155.3 branch is createdThe |
September 25 |
155.3 release candidate is createdThe 155.3 release candidate is created based on the |
September 25 |
155.2 is shipped155.2 is shipped on the Apple Store at 3:00 AM UTC with a phased 7 days rollout: |
September 28 |
Preliminary QA sign off on 155.3QA gives a preliminary sign off on 155.3. If it is green, we push the build to the External Beta Testers group. Otherwise, the dev team fixes the issues reported by QA, uplift them to the release branch and we build another Release Candidate. |
September 28 |
Final QA sign off on 155.3 Release notes readyQA gives its final sign off on 155.3. If the sign off is red, the dev team fixes the issues reported by QA, uplift them to the release branch and we build another Release Candidate. |
September 29 |
155.3 sent to Apple StoreWe submit 155.3 for review to the Apple Store. If we don`t have a working build by the end of the day, we may not ship this week. |
October 1 |
155.3 is shipped155.3 is shipped on the Apple Store at 3:00 AM UTC with a phased 7 days rollout: |
October 5 |